Traffic delays likely with road works on Co Kildare roads from next Monday

placeholder image

Co Kildare drivers are likely to be met by delays from next Monday onwards, for up to two weeks.

Road resurfacing works will take place along the R415 from Allenwood Cross to the bridge of the Travellers Rest Public House between Monday, June 25, and Friday, July 6.

It will be necessary to close this section of the R415 to through traffic for specific times over this two week period to carry out the road resurfacing works safely. These times are detailed below:

 Week 1 – Monday 25th June – Friday 29th June - R415 Allenwood to Kilmeague Road will be closed to through traffic from 6am to 8pm each day with the road re-opened each evening from 8pm until 6am the following morning.

Week 2 – Monday 2nd July – Friday 6th July - R415 Allenwood to Kilmeague Road will be closed to through traffic from 8am to 6pm each day with the road re-opened each evening from 6pm until 8.00am the following morning. Works will take place from 8am to 6pm each day.

Powered by
Register
Follow us
© 2026 Formpress Publishing LTD. All rights reserved.Cookie SettingsTerms and ConditionsPrivacy notice